Pueblo of Laguna Wastewater System Replacement

Pueblo of Laguna Wastewater System Replacement

TLC performed water system replacements and lagoon repair over a 360 calendar day duration, replacing over 2,600 feet of existing sanitary sewer gravity main. Significant removal and replacement of asphalt paving, concrete curb and gutter, and sidewalk were associated with the sanitary sewer replacement. Crews also expanded the existing lagoon system from 1.8 acres to 4.58 acres, re-graded and lined the expanded lagoon, and added site improvements.